Marine Logistics Support for Civil Engineering Project
Long standing client BAM Nuttall chartered the Wilcarry 1711 barge for the Poole South Quay extension project.
Over a 4-day period, BAM Nuttall utilised our marine base to prepare the barge and load a 160t crane and associated equipment. The barge was then towed by the Willsupply and Willchallenge to Poole.
Our logistics team also provided abnormal load transport for a large piling gate, split across multiple loads.
This was a tight programme to mobilise at your quayside in Southampton and safely deliver to Poole harbour due to the weather window we had. It’s a sincere thanks for the professionalism your team has shown and delivered, on that assumption we know readily we can rely on your support in the future.